Commissioned in 2017 this project focused on upgrades to systems and spaces to meet stringent CSA requirements to achieve the requirements for Airborne Infectious Isolation. Through detailed phasing planning and construction, asbestos abatement planning and stringent infection control measures these room were demolished, renovated and commissioned within an active intensive Care unit (ICU).
Work on these rooms included sealing and testing of the room envelopes to achieve the CSA specified negative pressures, new hospital rated acoustical attenuation, new emergency electrical power, room pressure controls and monitoring system, laboratory high plume fan and modifications to utilize existing air supply without major upgrades to that system. Other elements included modernizing items to meet current CSA Z8000 and infection control requirements including installation of hand wash sinks.
OVERCOMING CHALLENGES
Meeting & Exceeding
Our Project Goals
Our projects are proof of the quality and scale of the work that we do. And while our list of clients continues to grow, we never lose touch with the fact that quality work and good relationships are the backbone of our business.
-
1530
Square Metres Built
-
6247
Completed Projects
-
8032
Work With Us
-
1320
Ideas Realized
Related Projects
Take a look through some other CORE Engineering projects and learn more about the incredible builds that are team have accomplished.